وزیر اعظم جناب نریندر مودی نے آج ہانگژو ایشین پیرا گیمز میں مردوں کے جیولین تھرو-ایف 55 ایونٹ میں طلائی تمغہ جیتنے پر نیرج یادو کو مبارکباد پیش کی ہے ۔

وزیر اعظم نےایکس  پر پوسٹ کیا:

"نیرج یادو کو ایشین پیرا گیمز میں مردوں کے جیولن تھرو-ایف 55 میں شاندار طلائی تمغہ جیتنے کے لیے دلی مبارکباد۔

نیرج کا دوسرا طلائی تمغہ ایک تاریخی کامیابی ہے۔ ان کی آگے کی کوششوں کے لیے نیک خواہشات۔"

 

  • Mala Vijhani December 06, 2023

    Jai Hind Jai Bharat!
  • Mahendra singh Solanki Loksabha Sansad Dewas Shajapur mp October 30, 2023

    Jay shree Ram
  • Jaswinder Singh October 29, 2023

    Modiji's words, a source of light In para games, we take flight From limitations, we break free With Modiji's inspiration, we achieve victory Modiji's vision, a guiding star In para games, we push far With every challenge, we embrace Modiji's motivation, fuels our winning race Modiji's encouragement, a powerful force In para games, we stay on course. Against all odds, we stand tall Modiji's support, lifts us over the wall. Modiji's encouragement, a constant guide In para games, we reach high tide
  • Rao Sanjai Singh Maandi October 29, 2023

    बहुत ही शानदार प्रदर्शन किया है, बधाईयां एवं अनेकानेक शुभकामनाएं।
  • Umakant Mishra October 28, 2023

    congratulations
  • Geetha Reddy Nandikonda October 28, 2023

    Jai ho barath
  • Ranjeet Kumar October 28, 2023

    congratulations 🎉👏🎉
  • Ranjeet Kumar October 28, 2023

    new India 🇮🇳🇮🇳🇮🇳
  • Ranjeet Kumar October 28, 2023

    Jai bharat mata 🇮🇳🇮🇳🇮🇳
  • Ranjeet Kumar October 28, 2023

    Jai hind 🇮🇳🇮🇳🇮🇳
Explore More
وزیراعظم نریندر مودی کا 78 ویں یوم آزادی کے موقع پر لال قلعہ کی فصیل سے خطاب کا متن

Popular Speeches

وزیراعظم نریندر مودی کا 78 ویں یوم آزادی کے موقع پر لال قلعہ کی فصیل سے خطاب کا متن

Media Coverage

"Huge opportunity": Japan delegation meets PM Modi, expressing their eagerness to invest in India
NM on the go

Nm on the go

Always be the first to hear from the PM. Get the App Now!
...
Cabinet approves construction of 4-Lane greenfield and brownfield Patna-Arrah-Sasaram corridor in Bihar
March 28, 2025

The Cabinet Committee on Economic Affairs (CCEA), chaired by the Prime Minister Shri Narendra Modi, has approved the construction of 4-lane access controlled greenfield and brownfield Patna – Arrah – Sasaram corridor starting from Patna to Sasaram (120.10 km) in Bihar. The project will be developed on Hybrid Annuity Mode (HAM) at a total capital cost of Rs. 3,712.40 crore.

Currently, connectivity between Sasaram, Arrah and Patna relies on existing State Highways (SH-2, SH-12, SH-81 and SH-102) and takes 3-4 hours due to heavy congestion including in Arrah town. A greenfield corridor, along with 10.6 km of upgradation of existing brownfield highway, will be developed to reduce the increasing congestion, catering to the needs of densely built-up areas in places like Arrah, Grahini, Piro, Bikramganj, Mokar and Sasaram.

The project alignment integrates with major transport corridors, including NH-19, NH-319, NH-922, NH-131G, and NH-120, providing seamless connectivity to Aurangabad, Kaimur, and Patna. Additionally, the project will also provide connectivity to 02 airports (Patna’s Jay Prakash Narayan International Airport and upcoming Bihita airport), 04 major railway stations (Sasaram, Arrah, Danapur, Patna), and 01 Inland Water Terminal (Patna), and enhance direct access to Patna Ring Road, facilitating faster movement of goods and passengers.

Upon completion, the Patna-Arrah-Sasaram Corridor will play a pivotal role in regional economic growth, improving connectivity between Lucknow, Patna, Ranchi, and Varanasi. The project aligns with the government’s vision of Atmanirbhar Bharat, enhancing infrastructure while generating employment and fostering socio-economic development in Bihar. The project will also generate 48 lakh man days employment, and will open new avenues of growth, development and prosperity in developing regions in and around Patna.

Map of Corridor

|

Project Details:

Feature

Details

Project Name

4-Lane Greenfield & Brownfield Patna-Arrah-Sasaram Corridor

Corridor

Patna-Arrah-Sasaram (NH-119A)

Length (km)

120.10

Total Civil Cost (Rs. in Cr.)

2,989.08

Land Acquisition Cost (Rs. in Cr.)

718.97

Total Capital Cost (Rs. in Cr.)

3,712.40

Mode

Hybrid Annuity Mode (HAM)

Major Roads Connected

National Highways - NH-19, NH-319, NH-922, NH-131G, NH-120

State Highways - SH-2, SH-81, SH-12, SH-102

Economic / Social / Transport Nodes Connected

Airports: Jay Prakash Narayan International Airport (Patna), Bihita Airport (upcoming)

Railway Stations: Sasaram, Arrah, Danapur, Patna

Inland Water Terminal: Patna

Major Cities / Towns Connected

Patna, Arrah, Sasaram

Employment Generation Potential

22 lakh person-days (direct) & 26 lakh person-days (indirect)

Annual Average Daily Traffic (AADT) in FY-25

Estimated at 17,000-20,000 Passenger Car Units (PCUs)