Tune in to hear Mann Ki Baat on 30th June 2024

Published By : Admin | June 29, 2024 | 11:00 IST
  • Ratnesh Pandey April 18, 2025

    भारतीय जनता पार्टी ज़िंदाबाद ।। जय हिन्द ।।
  • ram Sagar pandey April 12, 2025

    🌹🙏🏻🌹जय श्रीराम🙏💐🌹🌹🌹🙏🙏🌹🌹जय माँ विन्ध्यवासिनी👏🌹💐ॐनमः शिवाय 🙏🌹🙏जय कामतानाथ की 🙏🌹🙏जय माँ विन्ध्यवासिनी👏🌹💐🌹🙏🏻🌹जय श्रीराम🙏💐🌹🌹🌹🙏🙏🌹🌹जय श्रीकृष्णा राधे राधे 🌹🙏🏻🌹जय माता दी 🚩🙏🙏🌹🌹🙏🙏🌹🌹
  • TUNA DANSANA March 02, 2025

    goo to
  • TUNA DANSANA March 02, 2025

    goo to up
  • DASARI SAISIMHA February 27, 2025

    🚩🪷
  • Priya Satheesh January 07, 2025

    🐯
  • ram Sagar pandey November 30, 2024

    🌹🙏🏻🌹जय श्रीराम🙏💐🌹🌹🌹🙏🙏🌹🌹जय श्रीकृष्णा राधे राधे 🌹🙏🏻🌹जय माता दी 🚩🙏🙏🌹🌹🙏🙏🌹🌹जय श्रीराम 🙏💐🌹
  • Chhedilal Mishra November 26, 2024

    Jai shrikrishna
  • கார்த்திக் November 04, 2024

    🌸💮🌺🙏🏾🙏🏿🙏🏻🙏🏽🙏🏼🙏🙏🏽🙏🏿🙏🌺💮🌸💮
  • Srikanta kumar panigrahi November 02, 2024

    indiaaaa
Explore More
Blood of every Indian is on the boil: PM Modi in Mann Ki Baat

Popular Speeches

Blood of every Indian is on the boil: PM Modi in Mann Ki Baat
From Digital India to Digital Classrooms-How Bharat’s Internet Revolution is Reaching its Young Learners

Media Coverage

From Digital India to Digital Classrooms-How Bharat’s Internet Revolution is Reaching its Young Learners
NM on the go

Nm on the go

Always be the first to hear from the PM. Get the App Now!
...
Cabinet approves construction of 4-Lane Badvel-Nellore Corridor in Andhra Pradesh
May 28, 2025
QuoteTotal capital cost is Rs.3653.10 crore for a total length of 108.134 km

The Cabinet Committee on Economic Affairs chaired by the Prime Minister Shri Narendra Modi has approved the construction of 4-Lane Badvel-Nellore Corridor with a length of 108.134 km at a cost of Rs.3653.10 crore in state of Andhra Pradesh on NH(67) on Design-Build-Finance-Operate-Transfer (DBFOT) Mode.

The approved Badvel-Nellore corridor will provide connectivity to important nodes in the three Industrial Corridors of Andhra Pradesh, i.e., Kopparthy Node on the Vishakhapatnam-Chennai Industrial Corridor (VCIC), Orvakal Node on Hyderabad-Bengaluru Industrial Corridor (HBIC) and Krishnapatnam Node on Chennai-Bengaluru Industrial Corridor (CBIC). This will have a positive impact on the Logistic Performance Index (LPI) of the country.

Badvel Nellore Corridor starts from Gopavaram Village on the existing National Highway NH-67 in the YSR Kadapa District and terminates at the Krishnapatnam Port Junction on NH-16 (Chennai-Kolkata) in SPSR Nellore District of Andhra Pradesh and will also provide strategic connectivity to the Krishnapatnam Port which has been identified as a priority node under Chennai-Bengaluru Industrial Corridor (CBIC).

The proposed corridor will reduce the travel distance to Krishanpatnam port by 33.9 km from 142 km to 108.13 km as compared to the existing Badvel-Nellore road. This will reduce the travel time by one hour and ensure that substantial gain is achieved in terms of reduced fuel consumption thereby reducing carbon foot print and Vehicle Operating Cost (VOC). The details of project alignment and Index Map is enclosed as Annexure-I.

The project with 108.134 km will generate about 20 lakh man-days of direct employment and 23 lakh man-days of indirect employment. The project will also induce additional employment opportunities due to increase in economic activity in the vicinity of the proposed corridor.

Annexure-I

 

 The details of Project Alignment and Index Map:

|

 Figure 1: Index Map of Proposed Corridor

|

 Figure 2: Detailed Project Alignment