PM to launch India’s first Regional Rapid Transit System (RRTS) on 20th October

Published By : Admin | October 18, 2023 | 16:23 IST
PM to inaugurate priority section of Delhi-Ghaziabad-Meerut RRTS Corridor; flag off RapidX train connecting Sahibabad to Duhai Depot
RRTS being developed in the country, is a state-of-the-art regional mobility solution, comparable to the best in the world
Development of RRTS will boost economic activity; provide improved access to employment, education & healthcare opportunities; and help in significant reduction of air pollution
In line with PM GatiShakti National Master Plan, RRTS network to have extensive multi-modal integration with Railway stations, Metro stations, Bus services etc.
PM to dedicate to the nation two stretches of east west corridor of Bengaluru Metro

Prime Minister Shri Narendra Modi will inaugurate the priority section of Delhi-Ghaziabad-Meerut RRTS Corridor at Sahibabad RapidX Station, Uttar Pradesh on 20th October at around 11:15 AM. He will also flag off the RapidX train connecting Sahibabad to Duhai Depot, marking the launch of Regional Rapid Transit System (RRTS) in India. At around 12 Noon, Prime Minister will preside over a public programme in Sahibabad where he will address the gathering on the occasion of launch of RRTS in the country. Further, he will also dedicate to the nation two stretches of east west corridor of Bengaluru Metro.

Delhi-Ghaziabad-Meerut RRTS Corridor

The 17 Km priority section of Delhi-Ghaziabad-Meerut RRTS Corridor that will be inaugurated, will connect Sahibabad to ‘Duhai Depot’ with stations at Ghaziabad, Guldhar and Duhai on the way. The foundation stone for Delhi-Ghaziabad-Meerut corridor was laid by the Prime Minister on 8th March 2019.

In line with the Prime Minister’s vision to transform regional connectivity in the country through construction of new world class transport infrastructure, the Regional Rapid Transit System (RRTS) project is being developed. RRTS is a new rail-based, semi-high-speed, high-frequency commuter transit system. With a design speed of 180 Kmph, RRTS is a transformational, regional development initiative, which is designed to provide high-speed trains for intercity commuting every 15 minutes, which can go up to a frequency of every 5 minutes as per requirement.

A total of eight RRTS corridors have been identified to be to be developed in NCR, out of which three corridors have been prioritised to be implemented in Phase-I including Delhi – Ghaziabad – Meerut Corridor; Delhi – Gurugram – SNB – Alwar Corridor; and Delhi – Panipat Corridor. The Delhi-Ghaziabad-Meerut RRTS being developed at a cost of more than Rs 30,000 crore, and will connect Delhi to Meerut in less than an hour of travel time going through the urban centres of Ghaziabad, Muradnagar, and Modinagar.

RRTS being developed in the country, is a state-of-the-art regional mobility solution, and is comparable to the best in the world. It will provide safe, reliable and modern intercity commuting solutions in the country. In line with PM GatiShakti National Master Plan, the RRTS network will have extensive multi-modal-integration with Railway stations, Metro stations, Bus services etc. Such transformative regional mobility solutions will boost economic activity in the region; provide improved access to employment, education & healthcare opportunities; and help in significant reduction of vehicular congestion & air pollution.

Bengaluru Metro

The two metro stretches that will be formally dedicated to the nation by the Prime Minister connect Baiyappanahalli to Krishnarajapura and Kengeri to Challaghatta. These two metro stretches were opened for public service from 9th October 2023 to provide convenience to the public commuting on this corridor, without waiting for formal inauguration.

Explore More
140 crore Indians have taken a collective resolve to build a Viksit Bharat: PM Modi on Independence Day

Popular Speeches

140 crore Indians have taken a collective resolve to build a Viksit Bharat: PM Modi on Independence Day
Annual malaria cases at 2 mn in 2023, down 97% since 1947: Health ministry

Media Coverage

Annual malaria cases at 2 mn in 2023, down 97% since 1947: Health ministry
NM on the go

Nm on the go

Always be the first to hear from the PM. Get the App Now!
...
PM chairs 45th PRAGATI Interaction
December 26, 2024
PM reviews nine key projects worth more than Rs. 1 lakh crore
Delay in projects not only leads to cost escalation but also deprives public of the intended benefits of the project: PM
PM stresses on the importance of timely Rehabilitation and Resettlement of families affected during implementation of projects
PM reviews PM Surya Ghar Muft Bijli Yojana and directs states to adopt a saturation approach for villages, towns and cities in a phased manner
PM advises conducting workshops for experience sharing for cities where metro projects are under implementation or in the pipeline to to understand the best practices and key learnings
PM reviews public grievances related to the Banking and Insurance Sector and emphasizes on quality of disposal of the grievances

Prime Minister Shri Narendra Modi earlier today chaired the meeting of the 45th edition of PRAGATI, the ICT-based multi-modal platform for Pro-Active Governance and Timely Implementation, involving Centre and State governments.

In the meeting, eight significant projects were reviewed, which included six Metro Projects of Urban Transport and one project each relating to Road connectivity and Thermal power. The combined cost of these projects, spread across different States/UTs, is more than Rs. 1 lakh crore.

Prime Minister stressed that all government officials, both at the Central and State levels, must recognize that project delays not only escalate costs but also hinder the public from receiving the intended benefits.

During the interaction, Prime Minister also reviewed Public Grievances related to the Banking & Insurance Sector. While Prime Minister noted the reduction in the time taken for disposal, he also emphasized on the quality of disposal of the grievances.

Considering more and more cities are coming up with Metro Projects as one of the preferred public transport systems, Prime Minister advised conducting workshops for experience sharing for cities where projects are under implementation or in the pipeline, to capture the best practices and learnings from experiences.

During the review, Prime Minister stressed on the importance of timely Rehabilitation and Resettlement of Project Affected Families during implementation of projects. He further asked to ensure ease of living for such families by providing quality amenities at the new place.

PM also reviewed PM Surya Ghar Muft Bijli Yojana. He directed to enhance the capacity of installations of Rooftops in the States/UTs by developing a quality vendor ecosystem. He further directed to reduce the time required in the process, starting from demand generation to operationalization of rooftop solar. He further directed states to adopt a saturation approach for villages, towns and cities in a phased manner.

Up to the 45th edition of PRAGATI meetings, 363 projects having a total cost of around Rs. 19.12 lakh crore have been reviewed.