Quote"12th Pravasi Bharatiya Divas to be held in New Delhi"
Quote"Shri Narendra Modi will address special interactive session during 12th Pravasi Bharatiya Divas in Delhi"
Quote"Gujarat’s pavilion at Pravasi Bharatiya Divas to showcase the state’s all round development"
Quote"Shri Modi to address NRIs on 9th January 2014"

On 9th January 2014 Shri Narendra Modi will address a special interactive session of the Pravasi Bharatiya Session 2014. In addition, the pavilion of the state of Gujarat will feature the all round development in the state in the last decade under the leadership of Shri Modi. This will include the development in the fields of industry, education, tourism, Jan Bhagidari. The pavilion will also feature information about the Statue of Unity project.

In addition to this, the Gujarat Government will be putting up a stall at the Overseas Indian Facilitation Centre where industry specific information will be available.

Shri Modi’s speech can be seen LIVE on the website and you can follow @narendramodi_in for real time updates on Twitter.

Minister Pradeepsinh Jadeja and Principal Secretary Shri Pankaj Kumar will accompany the Chief Minister. Last year, on 9th January 2013 Shri Modi had addressed NRIs during the Pravasi Bharatiya Divas in Kerala. Shri Modi’s speech was lauded by members of the Indian diaspora.

Explore More
২৭.০৪.২০২৫ দা শন্দোকখিবা মন কি বাতকী ১২১শুবা তাঙ্কক্ত প্রধান মন্ত্রীনা ফোঙদোকখিবা ৱারোল

Popular Speeches

২৭.০৪.২০২৫ দা শন্দোকখিবা মন কি বাতকী ১২১শুবা তাঙ্কক্ত প্রধান মন্ত্রীনা ফোঙদোকখিবা ৱারোল
Northeast hold keys to a $30 trillion economy

Media Coverage

Northeast hold keys to a $30 trillion economy
NM on the go

Nm on the go

Always be the first to hear from the PM. Get the App Now!
...
Cabinet approves construction of 4-Lane Badvel-Nellore Corridor in Andhra Pradesh
May 28, 2025
QuoteTotal capital cost is Rs.3653.10 crore for a total length of 108.134 km

The Cabinet Committee on Economic Affairs chaired by the Prime Minister Shri Narendra Modi has approved the construction of 4-Lane Badvel-Nellore Corridor with a length of 108.134 km at a cost of Rs.3653.10 crore in state of Andhra Pradesh on NH(67) on Design-Build-Finance-Operate-Transfer (DBFOT) Mode.

The approved Badvel-Nellore corridor will provide connectivity to important nodes in the three Industrial Corridors of Andhra Pradesh, i.e., Kopparthy Node on the Vishakhapatnam-Chennai Industrial Corridor (VCIC), Orvakal Node on Hyderabad-Bengaluru Industrial Corridor (HBIC) and Krishnapatnam Node on Chennai-Bengaluru Industrial Corridor (CBIC). This will have a positive impact on the Logistic Performance Index (LPI) of the country.

Badvel Nellore Corridor starts from Gopavaram Village on the existing National Highway NH-67 in the YSR Kadapa District and terminates at the Krishnapatnam Port Junction on NH-16 (Chennai-Kolkata) in SPSR Nellore District of Andhra Pradesh and will also provide strategic connectivity to the Krishnapatnam Port which has been identified as a priority node under Chennai-Bengaluru Industrial Corridor (CBIC).

The proposed corridor will reduce the travel distance to Krishanpatnam port by 33.9 km from 142 km to 108.13 km as compared to the existing Badvel-Nellore road. This will reduce the travel time by one hour and ensure that substantial gain is achieved in terms of reduced fuel consumption thereby reducing carbon foot print and Vehicle Operating Cost (VOC). The details of project alignment and Index Map is enclosed as Annexure-I.

The project with 108.134 km will generate about 20 lakh man-days of direct employment and 23 lakh man-days of indirect employment. The project will also induce additional employment opportunities due to increase in economic activity in the vicinity of the proposed corridor.

Annexure-I

 

 The details of Project Alignment and Index Map:

|

 Figure 1: Index Map of Proposed Corridor

|

 Figure 2: Detailed Project Alignment