QuotePM's joint interaction with Dutch CEOs

At the joint interaction with Dutch CEOs, Prime Minister Narendra Modi pitched for stronger economic ties with the Netherlands. The PM said highlighted India as a land of opportunities, the country's flourishing growth rate and reforms being undertaken to boost FDI.

|

The PM said Government's was determined to enhance ease of doing business and bring standards at par with global standards. He also appreciated Dutch Indian Water Alliance for Leadership Initiative (DIWALI) - A joint water tech initiative by both the countries.

Explore More
ಪ್ರತಿಯೊಬ್ಬ ಭಾರತೀಯನ ರಕ್ತ ಕುದಿಯುತ್ತಿದೆ: ಮನ್ ಕಿ ಬಾತ್ ನಲ್ಲಿ ಪ್ರಧಾನಿ ಮೋದಿ

ಜನಪ್ರಿಯ ಭಾಷಣಗಳು

ಪ್ರತಿಯೊಬ್ಬ ಭಾರತೀಯನ ರಕ್ತ ಕುದಿಯುತ್ತಿದೆ: ಮನ್ ಕಿ ಬಾತ್ ನಲ್ಲಿ ಪ್ರಧಾನಿ ಮೋದಿ
From Digital India to Digital Classrooms-How Bharat’s Internet Revolution is Reaching its Young Learners

Media Coverage

From Digital India to Digital Classrooms-How Bharat’s Internet Revolution is Reaching its Young Learners
NM on the go

Nm on the go

Always be the first to hear from the PM. Get the App Now!
...
Cabinet approves construction of 4-Lane Badvel-Nellore Corridor in Andhra Pradesh
May 28, 2025
QuoteTotal capital cost is Rs.3653.10 crore for a total length of 108.134 km

The Cabinet Committee on Economic Affairs chaired by the Prime Minister Shri Narendra Modi has approved the construction of 4-Lane Badvel-Nellore Corridor with a length of 108.134 km at a cost of Rs.3653.10 crore in state of Andhra Pradesh on NH(67) on Design-Build-Finance-Operate-Transfer (DBFOT) Mode.

The approved Badvel-Nellore corridor will provide connectivity to important nodes in the three Industrial Corridors of Andhra Pradesh, i.e., Kopparthy Node on the Vishakhapatnam-Chennai Industrial Corridor (VCIC), Orvakal Node on Hyderabad-Bengaluru Industrial Corridor (HBIC) and Krishnapatnam Node on Chennai-Bengaluru Industrial Corridor (CBIC). This will have a positive impact on the Logistic Performance Index (LPI) of the country.

Badvel Nellore Corridor starts from Gopavaram Village on the existing National Highway NH-67 in the YSR Kadapa District and terminates at the Krishnapatnam Port Junction on NH-16 (Chennai-Kolkata) in SPSR Nellore District of Andhra Pradesh and will also provide strategic connectivity to the Krishnapatnam Port which has been identified as a priority node under Chennai-Bengaluru Industrial Corridor (CBIC).

The proposed corridor will reduce the travel distance to Krishanpatnam port by 33.9 km from 142 km to 108.13 km as compared to the existing Badvel-Nellore road. This will reduce the travel time by one hour and ensure that substantial gain is achieved in terms of reduced fuel consumption thereby reducing carbon foot print and Vehicle Operating Cost (VOC). The details of project alignment and Index Map is enclosed as Annexure-I.

The project with 108.134 km will generate about 20 lakh man-days of direct employment and 23 lakh man-days of indirect employment. The project will also induce additional employment opportunities due to increase in economic activity in the vicinity of the proposed corridor.

Annexure-I

 

 The details of Project Alignment and Index Map:

|

 Figure 1: Index Map of Proposed Corridor

|

 Figure 2: Detailed Project Alignment